![]() If a circuit breaker can be set to trip at 1,200 A or higher, then one of a number of methods to reduce clearing time must be employed. Given that incident energy is a product of current and time, fault clearing time is a special concern wherever significant currents are present. What’s new in NEC 2017? One thing that’s new is an update to Article 240.87, Acceptable Methods for Arc Energy Reduction, which defines when arc-flash mitigation must be applied. Incident energy is calculated based on overcurrent device clearing times and available fault current at that equipment location. The 2011 version included a requirement to label equipment for arc-flash hazards, and this requirement was refined further in NFPA 70E in 2015 to add the arc-flash boundary and incident energy to the labels. The first discussion of arc flash appeared in the 2002 version. To provide some perspective on the latest changes, here’s a brief review of the NEC standard’s history as it relates to arc-flash protection. ![]() ![]() The newest edition of the standard, NEC 2017, includes some important changes that will affect how electrical equipment is designed, installed and maintained. In recognition of the dangers these events pose, the code-making panels and committee that develop the National Electrical Code® (NEC) standard have continued to refine the requirements related to arc flash protection. By Dean Katsiris and Dave Scheuerman, Littelfuse Inc.Īs any experienced industrial electrician can attest, arc-flash events can be destructive, costly and even fatal. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |